Pile stud method
Achieve high reliability and shortened construction time for the joint connection! Outstanding work efficiency and low cost!
The pile stud method is a technology that allows for design and construction that maximizes the performance of piles, significantly reduces construction by-products associated with the work, and enables short construction periods. 【Contact Information】 ■ Technical Inquiries Technical Development Department Phone Number: 03-3624-6201 ■ Inquiries for Estimates and Transactions For inquiries regarding estimates and transactions, please contact the respective branch via the URL below. http://www.okabe.co.jp/network/group.html
- Company:岡部
- Price:Other